With the successful release of the BEP battery distribution system, BEP saw the need for ready assembled clusters for different applications to make the installation within the battery area even easier. Following is the range as outlined in each diagram, which are overviews only.
All clusters are completely bused and pre-wired internally and are supplied with mounting fastenings along with easy to follow instructions. These include all connecting points clearly marked with ABC labels as shown in all illustrations.
Specifications:
SKU | BEP Part | Engine Setup | Battery Banks | DVSR | Orientation | Overall Dimensions (mm) |
ITA000062 | 714-140A-DVSR | Single Inboard or Outboard | 2 | Yes | Vertical | 138 x 69 |
ITA000067 | 716-H-140A-DVSR | Yes | Horizontal | 276 x 69 |
ITA000070 | 716-V-140A-DVSR | Yes | Vertical | 276 x 69 |
ITA000068 | 716-SQ-140A-DVSR | Yes | Square | 138 x 138 |
ITA000064 | 715-H | No | Horizontal | 207 x 69 |
ITA000066 | 715-V | No | Vertical | 69 x 207 |
ITA000065 | 715-S | Twin Inboard or Outboard | 2 | No | Horizontal | 210 x 69 |
ITA000072 | 718-140A-DVSR | Twin Inboard | 3 | Yes | Horizontal | 207 x 138 |
ITA000071 | 717-140A-DVSR | Twin Outboard | 3 | Yes | Horizontal | 138 x 207 |
ITA000073 | 719-140A-DVSR | Tripple Outboard | 4 | Yes | Square | 207 x 207 |